Your property
Checking what the rules allow in your town. This takes a few seconds.
Your property
Checking what the rules allow in your town. This takes a few seconds.
An accessory dwelling unit (ADU), a granny flat, in-law suite, or backyard home, can add rental income or family space. Whether Harrison Twp allows one, and how big, comes down to the town’s zoning and your specific lot. Here’s what we know, and how to check yours.
We've mapped Harrison Twp's residential zoning. An ADU on your lot follows the town's accessory-structure standards: check your specific address for the exact size, height, and setback it allows.
Source: TABLE 1 [F. Bulk standards. - (1)
From 2,525 real Harrison Twp permits in the New Jersey DCA record. The largest group, international residential code, takes a median of 65 days from filing to issue (n=2,022). This is elapsed time, not review hours: it includes the waiting and the corrections.
| Project type | Permits | Fastest 25% | Median | Slowest 25% |
|---|---|---|---|---|
| International Residential Code | 2,022 | 21d | 65d | 212d |
| Accessory buildings and miscellaneous structures | 328 | 43d | 102d | 299d |
| Business Uses | 125 | 35d | 93d | 255d |
| Mercantile buildings | 23 | 14d | 14d | 14d |
| Educational | 17 | 69d | 125d | 352d |
New Jersey has no single statewide ADU law. Each of the state's 564 municipalities, Harrison Twp (Gloucester County, NJ) included, sets its own zoning for accessory dwelling units (granny flats, in-law suites, backyard homes). Whether you can build one in Harrison Twp, how big, and how tall depends on the town's ordinance and your specific lot. We've mapped Harrison Twp's residential zoning: buildings are capped around 35 ft / 2.5 stories, with a minimum lot area near 5,300 sf. Your ADU follows the town's accessory-structure standards on top of that.
Our proven designs, each fitted to your lot, then made yours (trim, color, layout). Photorealistic renderings of the real thing, not stock photos.
Explore all modelsHarrison Twp sets its own ADU rules, and we've mapped its residential zoning. Whether your specific lot qualifies, and how big an ADU it allows, comes down to your parcel's size, setbacks, and the accessory-structure standards. Check your Harrison Twp address to see for sure, free.
A detached ADU in Harrison Twp typically runs $150,000 to $300,000+ all-in depending on size, site, and finishes. Because the build is financed, you can add rental income to your Harrison Twp property without paying the build cost up front, and the rent helps carry the loan.
Some NJ towns require owner-occupancy; others (like Jersey City) don't. We check Harrison Twp's specific ordinance for you when you run your address.
Enter your address and we read Harrison Twp’s zoning against your parcel and tell you if an ADU fits, how big, and what it could earn. Free.
Check if your Harrison Twp lot qualifies, free| Outdoor Activities, Grandstands, stadiums, tents, coliseums, etc. |
| 10 |
| 4d |
| 88d |
| 261d |
Source: NJ DCA UCC construction permit record. Days from application to issue. Cohorts under 10 permits and intervals beyond 1,095 days are excluded, the latter being a record-keeping artefact rather than a slow town.